On 24 March 2025, a new government proposal to amend the Energy Law (UC84) was published (“Project”). It introduces several important changes to the current regulatory framework for grid connection. The proposal is aimed at optimising the use of existing grid infrastructure and increasing the transparency of the grid connection process. Public consultations of the Project are now open.Read More